For builders
Recording variations properly, and avoiding final account disputes
29 August 2026 · 4 min read
Why a written, acknowledged variation register protects builders and homeowners alike, and what each entry should contain.
Almost every project changes. The problems start when changes are agreed in conversation, priced later, and remembered differently by each side at the final account.
What each variation entry should contain
- A reference number and the date the change was agreed
- What is changing, in plain language, and why
- The cost effect, whether an addition, an omission or no change
- The programme effect in days
- Who requested it and who accepted it
Acknowledge in writing, every time
A short message confirming the change and its cost, sent the same day and acknowledged by the client, resolves most disputes before they exist. It also produces a clear paper trail that later explains why the finished building differs from the original drawings.
Keep the variation register with the project record rather than in an email thread, so it is still readable when the job is closed and the site team has moved on.
Project Passport keeps these records together in one permanent digital record of your property, so the drawings, approvals, certificates, warranties and photographs of every project stay findable years after the work finishes. It is an independent record-keeping platform: it complements, and does not replace, Building Control, HM Land Registry, conveyancers or professional advice.
Keep the record
Your home has a history. Keep it.
Keep drawings, approvals, certificates, warranties and photographs together in one permanent digital record of your property.
More articles
Green Roof Installation: Paperwork and Structural Records to Keep
Installing a green roof requires structural, waterproofing, and planning records. Here is the essential paperwork UK homeowners must retain.
Adding an En-Suite Bathroom: Essential Records and Sign-Offs
Installing an en-suite involves ventilation, drainage, and electrical safety. Here are the Building Regulations sign-offs and paperwork you must keep.
Automated Electric Gates: Safety Sign-Offs and Records to Keep
Installing electric driveway gates involves specific machinery safety and electrical sign-offs. Here is the paperwork UK homeowners must keep.
