Certificates and compliance
Cavity Wall Tie Replacement: Paperwork and Records to Keep
30 September 2026 · 5 min read
Learn what reports, specifications, photographs, and guarantees to keep on file when replacing corroded cavity wall ties in a UK property.
Cavity wall ties are essential structural components that hold the outer leaf of brickwork to the inner load-bearing wall of a property. In many UK homes built between the late nineteenth century and the 1980s, original mild steel or galvanised ties corrode over time. When corrosion sets in, ties expand and rust, causing horizontal cracking along mortar beds, bulging brickwork, or outer leaf instability.
Replacing failing wall ties involves specialist remedial work. Because the ties sit concealed within the wall cavity once installed, prospective buyers, mortgage lenders, and structural surveyors will want clear documentary evidence showing the nature and quality of the repair. Keeping thorough records ensures you can demonstrate that the building remains structurally sound.
The Initial Wall Tie Survey and Inspection Report
Before remedial work begins, a specialist surveyor or structural engineer will typically assess the condition of existing ties using metal detectors and optical borescope cameras. This inspection determines the density of existing ties, their condition across different elevations, and whether corroded ties have caused visible bed-joint cracking.
Always keep the full written inspection report on file. The document should detail the findings per elevation, include photographic borescope evidence, note any external cracking, and outline the recommended remedial method. This original assessment proves why the work was necessary and provides a baseline for the structural history of the house.
Contractor Specification and Installation Details
Remedial wall tie installation must follow precise structural standards regarding tie spacing, embedment depth, and tie material. When hiring a contractor, obtain a detailed written specification outlining the exact method used.
- Tie material and grade: Remedial ties should generally be manufactured from austenitic stainless steel (grades 304 or 316) to prevent future corrosion.
- Fixing mechanism: The document should specify whether the ties are mechanical expansion ties, resin-bonded anchors, or drive-in helical ties, depending on the masonry type.
- Spacing pattern and density: The specification should confirm the number of ties installed per square metre, typically in line with relevant British Standards and Building Research Establishment (BRE) guidelines.
- Treatment of original ties: Where original fish-tail or wire ties have expanded and rusted, the report should state whether they were isolated (such as being cut and fitted with insulating sleeves) or removed entirely to prevent further masonry cracking.
Photographic Records of the Works
Because remedial ties are drilled directly into mortar beds or brick faces and subsequently repointed, the finished installation leaves minimal visual evidence from the outside. Photographic records taken during the installation provide clear verification that the ties were installed at the correct centres and depths.
Take or request photographs showing test-pull procedures, drill patterns before pointing, resin injection stages, and old tie isolation where undertaken. Storing these images digitally on a platform like Project Passport ensures that clear visual evidence remains attached to the property rather than lost in an old email thread or discarded invoice folder.
Guarantees and Structural Documentation
Specialist wall tie replacement work is typically accompanied by a long-term company warranty, often spanning 20 to 25 years. Where possible, homeowners should also retain an insurance-backed guarantee (IBG). An IBG ensures that cover remains in force even if the contractor ceases trading in the future.
Check the warranty terms to ensure it covers both the replacement ties and any associated structural isolation work. Verify whether the guarantee transfers automatically to subsequent property owners or requires a formal assignment process upon sale.
If a structural engineer was commissioned to calculate tie requirements or sign off the completed installation, file their written completion letter alongside the contractor invoice and guarantee. Using an independent record-keeping platform like Project Passport to collate these certificates, survey reports, and warranties keeps the structural history organized and accessible whenever the property is surveyed or put on the market.
Keep the record
Your home has a history. Keep it.
Keep drawings, approvals, certificates, warranties and photographs together in one permanent digital record of your property.
More articles
Installing a Dropped Kerb: Permissions and Paperwork to Keep
A guide to the licences, planning permissions, contractor accreditations, and highway sign-offs needed when installing a domestic dropped kerb.
Asbestos Surveys and Removal: Essential Paperwork to Keep
Renovating or selling a pre-2000 UK home? Here is the essential paperwork to keep for asbestos surveys, testing lab results, and hazardous waste disposal.
Build-Over Agreements: Paperwork and Records to Keep
Planning an extension near a public sewer? Here are the vital build-over records, CCTV surveys, and approvals you need to retain for your property.
